KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  2-14-2013
Number of Hours:  3.00
Manual Reference:  Page 8-5
Brief Description:  Landing gear box assembly #7

The gear box assemblies were riveted to the floor through the aft angles only.

The F-878 L/R were deburred, cleaned and primed.

The F-802T-1 and F-802N-1 were deburred, cleaned and primed.

Nutplates were installed in the proper areas.

8 washers were radiused and primed.

The 822 Weldments were riveted in place, making sure the brace holes were not riveted.

The 802's were riveted, bolted, and torqued.

The 878s were riveted, bolted and torqued.

Onto the Forward sub structure
' style=

Gears towers riveted to the floor

Gears towers riveted to the floor

' style=

F-802 upper braces installed

F-802 upper braces installed

' style=

878 mid cabin braces riveted and installed.

878 mid cabin braces riveted and installed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.