Powered By Kitlog Pro v2.0
My RV-8 build
RV-8
Fuselage
2-14-2013
< Previous Log Entry
Next Log Entry >
Date:
2-14-2013
Number of Hours:
3.00
Manual Reference:
Page 8-5
Brief Description:
Landing gear box assembly #7
The gear box assemblies were riveted to the floor through the aft angles only.
The F-878 L/R were deburred, cleaned and primed.
The F-802T-1 and F-802N-1 were deburred, cleaned and primed.
Nutplates were installed in the proper areas.
8 washers were radiused and primed.
The 822 Weldments were riveted in place, making sure the brace holes were not riveted.
The 802's were riveted, bolted, and torqued.
The 878s were riveted, bolted and torqued.
Onto the Forward sub structure
Gears towers riveted to the floor
F-802 upper braces installed
878 mid cabin braces riveted and installed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
452
866
About me
1
1
Avionics
3
4
Canopy
3
6
Electrical
4
6
Empennage
74
120
Engine
6
10
Finishing Kit
2
2
Flying
3
4
Fuselage
147
353
Instruments
2
0
Miscellaneous
14
36
Panel
7
17
Practice Kits
1
1
Tools
6
16
Wings
178
287
Workshop
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.